Control Take Over of Man B&W MC90V Engine from Bridge Control

Fault Finding and Action Plan

Short Term Action Plan
  • Continuous monitoring of engine parameters
  • Keep a close watch
  • Reduce engine speed ( reduce 1 RPM in 2 minutes period of time)
  • Max RPM within the limit of exhaust temperature deviation
Long Term Action Plan

Stop -> Replace -> Repair

Stopping Procedure of large two stroke MAN B&W MC90V Engine (VLCC ship)

Prequisite

1. Shaft generator on load at sea (full away)
2. Turbo generator
3. Both generators are stopped
  1. Start another generator if load on shaft generator
    1. Start D/G
    2. Synchronize
    3. Load sharing
    4. Off load Shaft Generator
Taking the shaft generator off load using Power Chief – Generator Control Panel
Power Chief – Generator Panel
Procedure (Referring to above screenshot):

i. Put generator no: 1 on priority 1

ii. Put generator no: 2 on priority 2

iii. Put Shaft Generator on priority 3

iv. Put “Control Mode” on “Equal Load

v. After a while generator 1 will start and take the load, shaft generator will off load.

vi. At 40% RPM, the shaft generator will be disengaged from the main engine

  1. Check oil fired boiler, keep it on “Automatic Combustion Control” to ensure automatic boiler operation.
  2. Make sure “turbo generator” steam source changed to oil fired boiler (previously from exhaust gas boiler) (assign 4/E for this)
  3. Fresh water generator distilled water on by-pass mode
  4. Make sure shaft generator is off-loaded
  5. Take over control to ECR